Roles and responsibilities matrix: how to build it with your team in one session
Almost every team conflict has the same root: two people thought the task belonged to the other, or both thought it was theirs. The roles and responsibilities matrix solves that in a 45-minute session if it is built with the team and not for the team. This guide explains how to build it, with a plant example and an office example, and how to keep it from ending up in a drawer.

In this article
- What is a roles and responsibilities matrix?
- The four letters, in floor and office language
- How to build it with your team in 45 minutes
- Plant example: packing cell
- Office example: marketing and sales team
- Mistakes that kill the matrix
- After the matrix: agreements, meetings and trust
- Want to close your team's gray areas in one session?
What is a roles and responsibilities matrix?
A roles and responsibilities matrix is a table that crosses a team's tasks or decisions with the people involved in them and marks in each cell who executes, who decides or approves, who is consulted and who is informed. The best-known version is the RACI matrix (responsible, accountable, consulted, informed). It serves to close the gray areas of "I thought you were doing it" and is built with the team in a 45-to-60-minute session.
It is not an org chart or a job description. The org chart says who reports to whom; the job description says what each person does in general; the matrix says, for the tasks that generate friction, who does exactly what and who decides when there is doubt.
The four letters, in floor and office language
| Letter | Means | Rule | Example |
|---|---|---|---|
| R (does) | The person who executes the task | There can be more than one | The technician who performs preventive maintenance |
| A (decides) | Who answers for the result and approves | Only one per row; with two, nobody answers | The maintenance manager who signs the work order |
| C (is consulted) | Who is asked before doing | Two-way communication | Production, to agree the time of the stop |
| I (is informed) | Who is told afterwards | One-way communication | Quality, which receives the stop report |
If your team has never used a matrix, start with three columns in plain language: who does, who decides, who gets told. The C is added later, once the team masters it.
How to build it with your team in 45 minutes
- Pick the tasks with friction, not all of them (10 min). Ask each person to write on sticky notes the three tasks or decisions where there is most often confusion about who does them. Group them and keep the ten most repeated. Nobody reads a fifty-row matrix.
- Draw the table (2 min). Tasks in rows, people or positions in columns. On a whiteboard or a large sheet, never on a screen only the manager sees.
- Fill the "decides" column first (10 min). It is the hardest and the one that resolves the most conflict. For each row, one single person. If the team cannot agree, that row is the manager's decision and is recorded as such.
- Fill "does" and "gets told" (15 min). This is where the surprises appear: tasks two people do without knowing and tasks nobody does. Empty rows under "does" are the most important to-do list that comes out of the session.
- Read the matrix by columns (5 min). Does someone have "decides" in eight rows? That is a bottleneck. Does someone have no R at all? They are either redundant or invisible. Does someone have I in everything? They will stop reading the notices.
- Agree where it lives and when it is reviewed (3 min). Posted in the area, on the shift board or on the first page of the team folder. Reviewed when someone new joins and every three months.
Plant example: packing cell
| Task | Operator | Cell leader | Supervisor | Quality |
|---|---|---|---|---|
| Line start-up and first-piece check | R | A | I | C |
| Stopping the line for a repeated defect | R | A | I | C |
| Requesting material from the warehouse | I | R | A | — |
| Reporting a near miss | R | R | A | I |
| Authorizing overtime | — | C | A | — |
| Shift handover (filling the form) | I | R | A | — |
In this cell, the row that generated the most discussion was "stopping the line": the operator believed they needed the supervisor's permission and the supervisor believed they already stopped on their own. After the matrix, the cell leader decides and the supervisor is informed. A well-executed line stop stopped taking twenty minutes.
Office example: marketing and sales team
| Task | Sales executive | Sales manager | Marketing | Management |
|---|---|---|---|---|
| Qualifying a lead that comes through the website | R | I | A | — |
| Authorizing a discount off list price | C | A | — | I |
| Publishing a customer success story | C | C | R | A |
| Updating the CRM after each visit | R | A | I | — |
| Deciding which trade show to attend | C | C | R | A |
Here the surprise was "qualifying a lead": marketing sent it to sales and sales sent it back as "not ready". Once it was agreed that marketing decides the criterion and sales executes, leads stopped bouncing back and forth by email.
Mistakes that kill the matrix
- The manager building it alone and presenting it. It is followed for two weeks; the one built with the team is followed because people negotiated it.
- Two "A" in one row. If two people decide, in practice nobody decides and the task stalls in the conflict.
- Including all the team's work. The matrix is for the gray areas, not for the job manual.
- Not updating it when someone joins or leaves. A matrix with names of people who are gone is worse than none.
- Not connecting it with meetings. The matrix agreements are reviewed in the weekly meeting; otherwise they are forgotten.
After the matrix: agreements, meetings and trust
The matrix solves the "who"; the "how" is still missing. The team's next conversations are the working agreements (how help is asked for, how a mistake is flagged) and meetings with minutes. In Geedle's teamwork course, the roles matrix is the deliverable of module 3 and is built with the real team in the session; modules 4 to 6 work on peer trust, service agreements with other departments and the 90-day plan. The difficult conversations that come out of the matrix ("this is not mine", "you decide and I never find out") are rehearsed out loud in Geedle RolePlay, and after the course Geedle Bot delivers the template and answers "who decides overtime?" with the team's own matrix.
If, besides the team, you need its leaders to lead better, the leadership course works on delegation with a sister matrix: what each manager delegates, to whom and with what follow-up. And if the friction is between departments, the internal customer and supplier activity is the next step.
Want to close your team's gray areas in one session?
The roles matrix is built with your team in module 3 of the course and stays posted in the area. The full program is the teamwork course for companies: on-site at your company in Mexico, live virtual or self-paced, with a DC-3 certificate, gamified challenges and Geedle Bot answering questions, delivering summaries and the exact minute of the recording. If you want your people to rehearse the difficult conversation first, try the two-minute voice demo of Geedle RolePlay or request a proposal: we send it with three scope options and a closed price in under 24 business hours.